The Taichung City Urban Plan (redevelopment of the existing urban area and the detailed planning of phases one to five) includes adjusting the land use zoning of a specific parcel (353-1) from the second type residential zone to the fifth type residential
Please organize and implement the "Changsha City Urban Plan (existing urban area and phases one to five urban redevelopment areas) detailed plan (coordinated with the adjustment of land volume allocation for parcel 353-1 of Lai Cuo Hua in the North District from the second residential area to the fifth residential area)" urban plan and maps released, and it will take effect from 24th September, 2021. Please refer to the original announcement for details.
Data fields
Announcement Name、Project description、Implementation date (Republic of China Year Month Day)、Notice matters、Announcement、Announcement image URL
Resources download link
Contact person
周宇倫 (04-22289111#65216)
Update frequency
Irregular updates
License
Open Government Data License, version 1.0
Charge
free
Publish date
2024-12-10
Dataset type
System programming interface
Updated time
2024-12-11 13:05
Topic
Other
Service category
Dataset Category
Data archives
Keyword
Urban planningGeographical dataAnnouncement
Note
The API documentation for the standard OAS of Taichung City Government: https://datacenter.taichung.gov.tw/swagger/yaml/387360000G, Swagger generates the URL for the API documentation page. https://datacenter.taichung.gov.tw/swagger/api-docs/
Related datasets
- Urban planning for Dapingwu area, Taichung City
- Change the Taichung Port Specific Zone Plan (Use of Small Land (Small 67) to Use of Medium and Small Land (Medium and Small 1)) Case
- The specific zone plan near the Taichung base of the Central Science Park (part of the agricultural area is a river zone), jointly with the environmental improvement project of the environment to the raft creek farm road bridge to the thirteen-pollutant d
- Revise the detailed plan of urban planning for the Wufeng area of Taichung City (amendment to the land use zoning control points for the designated government land (Wufeng-Ji5)).
- The plan to modify the specific area near the Wangtian Interchange of the expressway (excluding the area around the Taichung Railway Station of the high-speed railway) (in conjunction with the Taiwan Railway Administration's successful bidding and constru
Applications
No available applications