Jump to main content

Datagov Opendata Platform

Please arrange for the publication and implementation of the "Revised Taichung City Urban Plan (in line with the Taichung Metropolitan Mass Rapid Transit System Wuri-Wenxin-Beitun Line Construction Plan - MRT Depot) Detailed Plan (Amendment of Land Use Zoning Control and Urban Design Control Points, Point 5)," and it will take effect from zero o'clock on December 4, 110. Please refer to the original announcement information.

  • Gold badge
  • Platinum badge
  • Views: 24
  • Download times: 4
  • Comments: 0