Revise the detailed plan for the urban planning of Taichung City (the old urban area and the redevelopment area of phases one to five) (some residential areas of the third category are designated as parks and children's playgrounds).
Release and implement the "Amendment to the Detailed Plan of Taichung City Urban Plan (Existing Urban Area and Phase One to Five Urban Redevelopment Areas) (Partial Third Residential Zone as Park and Children's Playground) Case" urban plan book and maps, and take effect from 23 June 2018.
Data fields
Announcement Title、Project Description、Implementation date of announcement (ROC year month day)、Notice of Matters、Announcement URL、Announcement Image
Resources download link
Contact person
周宇倫 (04-22289111#65216)
Update frequency
Irregular updates
License
Open Government Data License, version 1.0
Charge
free
Publish date
2024-12-13
Dataset type
System programming interface
Updated time
2025-06-01 15:28
Topic
Other
Service category
Dataset Category
Data archives
Keyword
Urban planningAnnouncementGeographical data
Note
The API documentation of the Taichung City Government's OAS standard: https://datacenter.taichung.gov.tw/swagger/yaml/387360000G, The Swagger generates the API documentation page URL: https://datacenter.taichung.gov.tw/swagger/api-docs/
Related datasets
- The plan to modify the specific area near the Wangtian Interchange of the expressway (excluding the area around the Taichung Railway Station of the high-speed railway) (in conjunction with the Taiwan Railway Administration's successful bidding and constru
- Amendment to the Detailed Plan of the Taichung City Urban Plan (Four Zhaingli Area) (Adjustment of the volume of five parcels of land, including the 1115th land of the Ren De section in the Beitun District, and adjustment of the type of residential area f
- Change the Taichung Port Specific Zone Plan (Use of Small Land (Small 67) to Use of Medium and Small Land (Medium and Small 1)) Case
- The specific zone plan near the Taichung base of the Central Science Park (part of the agricultural area is a river zone), jointly with the environmental improvement project of the environment to the raft creek farm road bridge to the thirteen-pollutant d
- Revise the detailed plan for the Taichung City urban plan (in conjunction with the construction plan for the Wuri-Wenxin-Beitun Line of the Taichung Metropolitan Area Mass Rapid Transit System - MRT Depot) (amendments to land use zoning control and urban
Applications
No available applications