The plan to modify the specific area near the Wangtian Interchange of the expressway (excluding the area around the Taichung Railway Station of the high-speed railway) (in conjunction with the Taiwan Railway Administration's successful bidding and constru
Implement the "Specific Area Plan near Wangtian Interchange of the Expressway (excluding the area of Taichung Railway Station of the High Speed Railway) (in conjunction with the new construction of the successful pursuit of the successful section of the railway double-track project of Taiwan Railway Administration)" plan and the map, to be implemented starting from zero o'clock on September 19, 2019.
Data fields
Announcement Title、Project description、Implementation date (Republic of China year, month, day)、Announcement
Resources download link
Contact person
周宇倫 (04-22289111#65216)
Update frequency
Irregular updates
License
Open Government Data License, version 1.0
Charge
free
Publish date
2024-12-11
Dataset type
System programming interface
Updated time
2024-12-12 09:17
Topic
Other
Service category
Dataset Category
Data archives
Keyword
Urban planningAnnouncementGeographical data
Note
The API documentation for the standard of the Taichung City Government Office of Secretariat (OAS) can be found at: https://datacenter.taichung.gov.tw/swagger/yaml/387360000G. The Swagger generates the API documentation page URL: https://datacenter.taichung.gov.tw/swagger/api-docs/
Related datasets
- Urban planning for Dapingwu area, Taichung City
- Amendment to the Detailed Plan of the Taichung City Urban Plan (Four Zhaingli Area) (Adjustment of the volume of five parcels of land, including the 1115th land of the Ren De section in the Beitun District, and adjustment of the type of residential area f
- The Taichung City Urban Plan (redevelopment of the existing urban area and the detailed planning of phases one to five) includes adjusting the land use zoning of a specific parcel (353-1) from the second type residential zone to the fifth type residential
- Change the Taichung Port Specific Zone Plan (Use of Small Land (Small 67) to Use of Medium and Small Land (Medium and Small 1)) Case
- The specific zone plan near the Taichung base of the Central Science Park (part of the agricultural area is a river zone), jointly with the environmental improvement project of the environment to the raft creek farm road bridge to the thirteen-pollutant d
Applications
No available applications